{"id":725,"date":"2026-02-24T17:39:36","date_gmt":"2026-02-24T16:39:36","guid":{"rendered":"http:\/\/localhost:10003\/conseils-dexperts-pour-maitriser-lintegration-de-nouveaux-equipements\/"},"modified":"2026-03-11T17:09:40","modified_gmt":"2026-03-11T16:09:40","slug":"expert-advice-for-controlling-the-integration-of-new-equipment","status":"publish","type":"post","link":"https:\/\/storcan.com\/en\/expert-advice-for-controlling-the-integration-of-new-equipment\/","title":{"rendered":"Expert advice for controlling the integration of new equipment"},"content":{"rendered":"<p><span style=\"font-weight: 400;\"><br \/>\nIntegrating new equipment into your production or packaging line is a project with numerous challenges to overcome for your operations. There are best practices to follow to ensure that these changes in your processes and habits don&#8217;t turn into a negative experience.<\/span><\/p>\n<p><strong>Storcan&#8217;s project management team, which accompanies our clients throughout their integration projects, has compiled their best advice to guarantee a smooth and effective transition:<\/strong><\/p>\n<ol>\n<li><span style=\"font-weight: 400;\">Analyze your needs accurately<\/span><span style=\"font-weight: 400;\">: Before choosing a new production line, clearly identify your requirements in terms of capacity, technology, and flexibility to ensure a seamless integration. Every detail is important, whether it&#8217;s technical, environmental, or even human or legal.<\/span><\/li>\n<li><span style=\"font-weight: 400;\">Involve all internal players\u00a0from the beginning and throughout the project:<\/span><span style=\"font-weight: 400;\">Transparent communication and collaboration between production, engineering, and project management teams are essential to align objectives and minimize surprises during the integration process.<\/span><\/li>\n<li><span style=\"font-weight: 400;\">Plan and prepare each step meticulously while being prepared for the unexpected<\/span><span style=\"font-weight: 400;\">: Establish a detailed schedule that includes installation phases, real production testing, and staff training. Clear planning and preparation reduce delays and production interruptions. At the same time, prepare to manage unforeseen circumstances, especially during the line&#8217;s production start-up, when mechanical, electrical, or programming adjustments are necessary for optimal performance.<\/span><\/li>\n<li><span style=\"font-weight: 400;\">Identify all products that will be transported<\/span><span style=\"font-weight: 400;\">: From the analysis of your needs, it is essential to accurately identify all products that will be transported on the new line. At the production start-up, testing with all these pre-identified products is a prerequisite for correctly configuring the operability of your new equipment.<\/span><\/li>\n<li><span style=\"font-weight: 400;\">Invest in staff training<\/span><span style=\"font-weight: 400;\">: A new production line may require new skills and knowledge. Ensure that your team is trained and ready to operate the new technology efficiently.<\/span><\/li>\n<li><span style=\"font-weight: 400;\">Collaborate with your suppliers<\/span><span style=\"font-weight: 400;\">: Working collaboratively, having a common goal, and maintaining smooth and transparent communication are the keys to success in this type of project. By sharing information about your reality, constraints, daily challenges, and even doubts, the project manager can be more proactive and effective.<\/span><\/li>\n<li><span style=\"font-weight: 400;\">Be the conductor between different suppliers<\/span><span style=\"font-weight: 400;\">: If you decide to engage multiple specialists to integrate your line, communication between each party will be crucial. You must ensure that each suppliers shares their technical information and schedules.<\/span><\/li>\n<\/ol>\n<p><span style=\"font-weight: 400;\">At Storcan, we understand the importance of all these crucial aspects when integrating new production lines. Our team is dedicated to advising and providing not only cutting-edge solutions but also offering personalized support at every step of the process.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">Feel free to contact us to discuss how we can meet your specific needs and help optimize your production.\u00a0<\/span><a href=\"mailto:info@storcan.com\"><span style=\"font-weight: 400;\">Send us an email!<\/span><\/a><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Integrating new equipment into your production or packaging line is a project with numerous challenges to overcome for your operations. There are best practices to follow to ensure that these changes in your processes and habits don&#8217;t turn into a negative experience. Storcan&#8217;s project management team, which accompanies our clients throughout their integration projects, has [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":726,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"inline_featured_image":false,"footnotes":""},"categories":[12],"tags":[],"secteur-dactivite":[],"technologie-de-production":[],"class_list":["post-725","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-post"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v27.8 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Expert advice for controlling the integration of new equipment | Storcan<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/storcan.com\/conseils-dexperts-pour-maitriser-lintegration-de-nouveaux-equipements\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Expert advice for controlling the integration of new equipment | Storcan\" \/>\n<meta property=\"og:description\" content=\"Integrating new equipment into your production or packaging line is a project with numerous challenges to overcome for your operations. There are best practices to follow to ensure that these changes in your processes and habits don&#8217;t turn into a negative experience. Storcan&#8217;s project management team, which accompanies our clients throughout their integration projects, has [&hellip;]\" \/>\n<meta property=\"og:url\" content=\"https:\/\/storcan.com\/conseils-dexperts-pour-maitriser-lintegration-de-nouveaux-equipements\/\" \/>\n<meta property=\"og:site_name\" content=\"Storcan\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/storcanindustries\" \/>\n<meta property=\"article:published_time\" content=\"2026-02-24T16:39:36+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2026-03-11T16:09:40+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/storcan.com\/wp-content\/uploads\/2026\/02\/Storcan-Article-21.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"700\" \/>\n\t<meta property=\"og:image:height\" content=\"400\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"_propage\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/storcan.com\\\/conseils-dexperts-pour-maitriser-lintegration-de-nouveaux-equipements\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/storcan.com\\\/conseils-dexperts-pour-maitriser-lintegration-de-nouveaux-equipements\\\/\"},\"author\":{\"name\":\"_propage\",\"@id\":\"http:\\\/\\\/storcan.com\\\/#\\\/schema\\\/person\\\/8b418373ba22790b6004b58302c2fcea\"},\"headline\":\"Expert advice for controlling the integration of new equipment\",\"datePublished\":\"2026-02-24T16:39:36+00:00\",\"dateModified\":\"2026-03-11T16:09:40+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/storcan.com\\\/conseils-dexperts-pour-maitriser-lintegration-de-nouveaux-equipements\\\/\"},\"wordCount\":437,\"publisher\":{\"@id\":\"http:\\\/\\\/storcan.com\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/storcan.com\\\/conseils-dexperts-pour-maitriser-lintegration-de-nouveaux-equipements\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/storcan.com\\\/wp-content\\\/uploads\\\/2026\\\/02\\\/Storcan-Article-21.jpg\",\"articleSection\":[\"Post\"],\"inLanguage\":\"en-CA\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/storcan.com\\\/conseils-dexperts-pour-maitriser-lintegration-de-nouveaux-equipements\\\/\",\"url\":\"https:\\\/\\\/storcan.com\\\/conseils-dexperts-pour-maitriser-lintegration-de-nouveaux-equipements\\\/\",\"name\":\"Expert advice for controlling the integration of new equipment | Storcan\",\"isPartOf\":{\"@id\":\"http:\\\/\\\/storcan.com\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/storcan.com\\\/conseils-dexperts-pour-maitriser-lintegration-de-nouveaux-equipements\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/storcan.com\\\/conseils-dexperts-pour-maitriser-lintegration-de-nouveaux-equipements\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/storcan.com\\\/wp-content\\\/uploads\\\/2026\\\/02\\\/Storcan-Article-21.jpg\",\"datePublished\":\"2026-02-24T16:39:36+00:00\",\"dateModified\":\"2026-03-11T16:09:40+00:00\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/storcan.com\\\/conseils-dexperts-pour-maitriser-lintegration-de-nouveaux-equipements\\\/#breadcrumb\"},\"inLanguage\":\"en-CA\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/storcan.com\\\/conseils-dexperts-pour-maitriser-lintegration-de-nouveaux-equipements\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-CA\",\"@id\":\"https:\\\/\\\/storcan.com\\\/conseils-dexperts-pour-maitriser-lintegration-de-nouveaux-equipements\\\/#primaryimage\",\"url\":\"https:\\\/\\\/storcan.com\\\/wp-content\\\/uploads\\\/2026\\\/02\\\/Storcan-Article-21.jpg\",\"contentUrl\":\"https:\\\/\\\/storcan.com\\\/wp-content\\\/uploads\\\/2026\\\/02\\\/Storcan-Article-21.jpg\",\"width\":700,\"height\":400},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/storcan.com\\\/conseils-dexperts-pour-maitriser-lintegration-de-nouveaux-equipements\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Accueil\",\"item\":\"http:\\\/\\\/storcan.com\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Expert advice for controlling the integration of new equipment\"}]},{\"@type\":\"WebSite\",\"@id\":\"http:\\\/\\\/storcan.com\\\/#website\",\"url\":\"http:\\\/\\\/storcan.com\\\/\",\"name\":\"Storcan\",\"description\":\"\",\"publisher\":{\"@id\":\"http:\\\/\\\/storcan.com\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"http:\\\/\\\/storcan.com\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-CA\"},{\"@type\":\"Organization\",\"@id\":\"http:\\\/\\\/storcan.com\\\/#organization\",\"name\":\"Storcan\",\"url\":\"http:\\\/\\\/storcan.com\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-CA\",\"@id\":\"http:\\\/\\\/storcan.com\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/storcan.com\\\/wp-content\\\/uploads\\\/2026\\\/06\\\/storcan-smo.jpg\",\"contentUrl\":\"https:\\\/\\\/storcan.com\\\/wp-content\\\/uploads\\\/2026\\\/06\\\/storcan-smo.jpg\",\"width\":778,\"height\":790,\"caption\":\"Storcan\"},\"image\":{\"@id\":\"http:\\\/\\\/storcan.com\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"sameAs\":[\"https:\\\/\\\/www.facebook.com\\\/storcanindustries\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/storcan-ltee\\\/\",\"https:\\\/\\\/www.youtube.com\\\/@storcan-productionlinesolu6357\"]},{\"@type\":\"Person\",\"@id\":\"http:\\\/\\\/storcan.com\\\/#\\\/schema\\\/person\\\/8b418373ba22790b6004b58302c2fcea\",\"name\":\"_propage\",\"sameAs\":[\"http:\\\/\\\/storcan.com\"]}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Expert advice for controlling the integration of new equipment | Storcan","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/storcan.com\/conseils-dexperts-pour-maitriser-lintegration-de-nouveaux-equipements\/","og_locale":"en_US","og_type":"article","og_title":"Expert advice for controlling the integration of new equipment | Storcan","og_description":"Integrating new equipment into your production or packaging line is a project with numerous challenges to overcome for your operations. There are best practices to follow to ensure that these changes in your processes and habits don&#8217;t turn into a negative experience. Storcan&#8217;s project management team, which accompanies our clients throughout their integration projects, has [&hellip;]","og_url":"https:\/\/storcan.com\/conseils-dexperts-pour-maitriser-lintegration-de-nouveaux-equipements\/","og_site_name":"Storcan","article_publisher":"https:\/\/www.facebook.com\/storcanindustries","article_published_time":"2026-02-24T16:39:36+00:00","article_modified_time":"2026-03-11T16:09:40+00:00","og_image":[{"width":700,"height":400,"url":"https:\/\/storcan.com\/wp-content\/uploads\/2026\/02\/Storcan-Article-21.jpg","type":"image\/jpeg"}],"author":"_propage","schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/storcan.com\/conseils-dexperts-pour-maitriser-lintegration-de-nouveaux-equipements\/#article","isPartOf":{"@id":"https:\/\/storcan.com\/conseils-dexperts-pour-maitriser-lintegration-de-nouveaux-equipements\/"},"author":{"name":"_propage","@id":"http:\/\/storcan.com\/#\/schema\/person\/8b418373ba22790b6004b58302c2fcea"},"headline":"Expert advice for controlling the integration of new equipment","datePublished":"2026-02-24T16:39:36+00:00","dateModified":"2026-03-11T16:09:40+00:00","mainEntityOfPage":{"@id":"https:\/\/storcan.com\/conseils-dexperts-pour-maitriser-lintegration-de-nouveaux-equipements\/"},"wordCount":437,"publisher":{"@id":"http:\/\/storcan.com\/#organization"},"image":{"@id":"https:\/\/storcan.com\/conseils-dexperts-pour-maitriser-lintegration-de-nouveaux-equipements\/#primaryimage"},"thumbnailUrl":"https:\/\/storcan.com\/wp-content\/uploads\/2026\/02\/Storcan-Article-21.jpg","articleSection":["Post"],"inLanguage":"en-CA"},{"@type":"WebPage","@id":"https:\/\/storcan.com\/conseils-dexperts-pour-maitriser-lintegration-de-nouveaux-equipements\/","url":"https:\/\/storcan.com\/conseils-dexperts-pour-maitriser-lintegration-de-nouveaux-equipements\/","name":"Expert advice for controlling the integration of new equipment | Storcan","isPartOf":{"@id":"http:\/\/storcan.com\/#website"},"primaryImageOfPage":{"@id":"https:\/\/storcan.com\/conseils-dexperts-pour-maitriser-lintegration-de-nouveaux-equipements\/#primaryimage"},"image":{"@id":"https:\/\/storcan.com\/conseils-dexperts-pour-maitriser-lintegration-de-nouveaux-equipements\/#primaryimage"},"thumbnailUrl":"https:\/\/storcan.com\/wp-content\/uploads\/2026\/02\/Storcan-Article-21.jpg","datePublished":"2026-02-24T16:39:36+00:00","dateModified":"2026-03-11T16:09:40+00:00","breadcrumb":{"@id":"https:\/\/storcan.com\/conseils-dexperts-pour-maitriser-lintegration-de-nouveaux-equipements\/#breadcrumb"},"inLanguage":"en-CA","potentialAction":[{"@type":"ReadAction","target":["https:\/\/storcan.com\/conseils-dexperts-pour-maitriser-lintegration-de-nouveaux-equipements\/"]}]},{"@type":"ImageObject","inLanguage":"en-CA","@id":"https:\/\/storcan.com\/conseils-dexperts-pour-maitriser-lintegration-de-nouveaux-equipements\/#primaryimage","url":"https:\/\/storcan.com\/wp-content\/uploads\/2026\/02\/Storcan-Article-21.jpg","contentUrl":"https:\/\/storcan.com\/wp-content\/uploads\/2026\/02\/Storcan-Article-21.jpg","width":700,"height":400},{"@type":"BreadcrumbList","@id":"https:\/\/storcan.com\/conseils-dexperts-pour-maitriser-lintegration-de-nouveaux-equipements\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Accueil","item":"http:\/\/storcan.com\/"},{"@type":"ListItem","position":2,"name":"Expert advice for controlling the integration of new equipment"}]},{"@type":"WebSite","@id":"http:\/\/storcan.com\/#website","url":"http:\/\/storcan.com\/","name":"Storcan","description":"","publisher":{"@id":"http:\/\/storcan.com\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"http:\/\/storcan.com\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-CA"},{"@type":"Organization","@id":"http:\/\/storcan.com\/#organization","name":"Storcan","url":"http:\/\/storcan.com\/","logo":{"@type":"ImageObject","inLanguage":"en-CA","@id":"http:\/\/storcan.com\/#\/schema\/logo\/image\/","url":"https:\/\/storcan.com\/wp-content\/uploads\/2026\/06\/storcan-smo.jpg","contentUrl":"https:\/\/storcan.com\/wp-content\/uploads\/2026\/06\/storcan-smo.jpg","width":778,"height":790,"caption":"Storcan"},"image":{"@id":"http:\/\/storcan.com\/#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/storcanindustries","https:\/\/www.linkedin.com\/company\/storcan-ltee\/","https:\/\/www.youtube.com\/@storcan-productionlinesolu6357"]},{"@type":"Person","@id":"http:\/\/storcan.com\/#\/schema\/person\/8b418373ba22790b6004b58302c2fcea","name":"_propage","sameAs":["http:\/\/storcan.com"]}]}},"_links":{"self":[{"href":"https:\/\/storcan.com\/en\/wp-json\/wp\/v2\/posts\/725","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/storcan.com\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/storcan.com\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/storcan.com\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/storcan.com\/en\/wp-json\/wp\/v2\/comments?post=725"}],"version-history":[{"count":2,"href":"https:\/\/storcan.com\/en\/wp-json\/wp\/v2\/posts\/725\/revisions"}],"predecessor-version":[{"id":910,"href":"https:\/\/storcan.com\/en\/wp-json\/wp\/v2\/posts\/725\/revisions\/910"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/storcan.com\/en\/wp-json\/wp\/v2\/media\/726"}],"wp:attachment":[{"href":"https:\/\/storcan.com\/en\/wp-json\/wp\/v2\/media?parent=725"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/storcan.com\/en\/wp-json\/wp\/v2\/categories?post=725"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/storcan.com\/en\/wp-json\/wp\/v2\/tags?post=725"},{"taxonomy":"secteur-dactivite","embeddable":true,"href":"https:\/\/storcan.com\/en\/wp-json\/wp\/v2\/secteur-dactivite?post=725"},{"taxonomy":"technologie-de-production","embeddable":true,"href":"https:\/\/storcan.com\/en\/wp-json\/wp\/v2\/technologie-de-production?post=725"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}